ZNSJ High-strength Alloy Steel Formwork
|
New materials
Ultra high strength: high strength, large stiffness
Corrosion resistance: Strong corrosion resistance, not easy to rust.
New products
Lightweight: Standard panel weighs 25kg/㎡
High Load-bearing capacity:>60KN/㎡
New Processes
Rolling forming: The panel and frame are bent and formed in one step, resulting in a flat surface and high production efficiency.
Welding: Reinforcements are welded using automatic laser welding, ensuring no deformation or cracking.
Refurbishment: Ash is removed using a steel wire roller brush, with simple equipment and low cost.
New technology
All-steel system: suitable for projects with multiple standard floors and high quality requirements
Steel wood hybrid system: suitable for base,emts. mpm-standard avove-groud floors, public buildings, factories, and other sturctures.
Steel-Aluminum hybrid System: Compatible with existing aluminum formwork in the domestic market.
BIM technology application: automatic layout, one click generation of lists for standard steel formwork and non-standard wood formwork.
One on one nanny style service
One on one service: one project, one team, providing nanny style services
Pre sales: Provide free preliminary evaluation of drawings and provide optimization solutions
On sale: Customized and satisfactory mold matching solution, deep optimization of drawings, factory pre installation in advance, solving the first layer assembly time after materials enter the site
After sales: Provide installation guidance and eliminate technical difficulties during the construction process
3020+5424 Quick Response Mechanism
Delivery will be made within 30 days after the deepening of the drawings, and some projects can be delivered within 20 days. It is efficient and fast, with a 5-minute call back and a 4-hour response to project issues. Personnel will be sent to the site within 24 hours for handling.
Environmentally
The energy consumption for producing 1 ton of steel is about 1/9 of the energy consumption for producing 1 ton of aluminum; And the steel mold renovation does not require manual polishing and has no noise pollution.
Economic
The raw material price of high-strength alloy steel formwork is about 70% lower than that of aluminum formwork; The production cost of new boards is reduced by 5% -8% compared to aluminum templates; The renovation cost is about 30% lower than that of aluminum alloy templates.
High strength
The high-strength alloy steel formwork is made of Q700 material, which has high hardness and can withstand greater pressure and impact without deformation and wear.
Better molding quality
High strength alloy steel formwork has lower adsorption force, is easier to demold, has fewer bubbles, and does not peel off. It has better forming effect and better appearance than aluminum alloy formwork.
Reduce processes
High strength alloy steel formwork can be exempted from the template spraying process.
Reduce management difficulty
Steel formwork has low cost and can reduce on-site formwork management time and personnel investment.
When to use steel shuttering:
Large-scale projects: High-rise buildings, bridges, and infrastructure projects.
Projects requiring a smooth finish: Steel provides a smoother finish than timber.
Projects with repetitive elements: Steel's reusability makes it cost-effective for repetitive structures.
Structures needing high strength and durability: Steel can handle heavy loads.